P5220018.JPG
Side door is now installed, the fascia has been installed and painted and the siding is installed on the end of the upper gable.
Date: 05/22/2009
Views: 1474
|
P5230028.JPG
Second floor observatory area showing top of pier and bolts.
Date: 05/23/2009
Views: 1423
|
P5250039.JPG
A view of the roof pulley mechanism. This was the first of a number of different attempts to make this frame rigid enough to withstand the forces involved in moving the roof.
Date: 05/25/2009
Views: 1686
|
|
P5300043.JPG
Beginning the aluminum roof installation. Check out the hawk passing overhead trying to figure out what this new encroachment on his territory is.
Date: 05/30/2009
Views: 1818
|
P5300059.JPG
Look, look it is blue sky and the Sun is out. Great! That makes this aluminum material about a million degrees to the touch. I think that the bottom of my boots were melting.
Date: 05/30/2009
Views: 1620
|
P5300067.JPG
The Lesueur pier installed.
Date: 05/30/2009
Views: 1829
|
|
P5300075.JPG
The refrigerator and microwave are purchased. The overhead fluorescent lights have been installed in the garage.
Date: 05/30/2009
Views: 1762
|
P5310079.JPG
The upper roof is done. Thank goodness, it was scary way up there.
Date: 05/31/2009
Views: 1423
|
P5310081.JPG
It is a long way down from here.
Date: 05/31/2009
Views: 1545
|