P5080001.JPG
A view from the south end showing the upper rolling roof trusses almost completed and the roof in the half rolled off position.
Date: 05/08/2009
Views: 1616
|
P5080003.JPG
Another view of the nearly completed roof framing
Date: 05/08/2009
Views: 1547
|
P5090010.JPG
The weather senses my nearly completed roof and begins its attack once again
Date: 05/09/2009
Views: 1443
|
|
P5110018.JPG
The tar paper on the upper roof has now been installed. Finally, the rain poses a reduced threat to continued damage of the OSB and other building materials. The interior doors did not fair too well and delamination and mold occurred, as may be seen in la
Date: 05/11/2009
Views: 1253
|
P5110022.JPG
A good view of the underside of the rolling roof and trusses. Sure, now the Sun comes out.
Date: 05/11/2009
Views: 1240
|
P5110028.JPG
Scaffolding erected to complete upper siding, painting of beam sandwiches and installation of roof fascia boards
Date: 05/11/2009
Views: 1176
|
|
P5170025.JPG
Finishing the upstairs siding on the last (western) wall. Yup, soaked again.
Date: 05/17/2009
Views: 1185
|
P5170012.JPG
Putting up more siding, in the rain. This is the south side of the building over the garage door. You can barely see that I have completed installation of the garage door at this point. That was pleasant indoor work.
Date: 05/17/2009
Views: 1176
|
P5220002.JPG
This is a closup view of how I finished off the ends of the beam sandwiches.
Date: 05/22/2009
Views: 1391
|