P4110078.JPG
The wall framing is completed on the garage end of the building, including the garage door opening.
Date: 04/11/2009
Views: 1273
|
P4110080.JPG
Siding on the east wall first floor completed. Notice how the 6x6 columns are integrated into these walls for strength.
Date: 04/11/2009
Views: 1241
|
P4120084.JPG
Roofing material going up. Hurry, more rain is coming.
Date: 04/12/2009
Views: 1227
|
|
P4150088.JPG
Roofing plywood over garage is nearly completed and the end gable is just about done here.
Date: 04/15/2009
Views: 1342
|
P4150093.JPG
A view of the second floor showing how the top of the stairs enters and the top of the pier (under the scrap lumber on the left) flush with the floor. The discoloration of the flooring is due to a coating put down in an attempt to limit damage to the OSB
Date: 04/15/2009
Views: 1372
|
P4180005.JPG
This trencher is what I used to dig the 250' long ditch to install the electrical power cable. This thing was a beast: very hard to control. Too bad it didn't also fill in the trench. Doing that by hand was no fun.
Date: 04/18/2009
Views: 1211
|
|
P4180007.JPG
Of course before this trench got dug, I had to clear the path from trees, vines, big rocks, etc.
Date: 04/18/2009
Views: 1516
|
100_3152.JPG
I'll bet that Rambo wished that his tasks were so mundane. Check out the roots in the trench. Fun stuff on a 90 degree day.
Date: 04/18/2009
Views: 1519
|
P5200030.JPG
I installed regular mobile home feed for 100 amp service.
Date: 05/20/2009
Views: 1292
|