Red Hawk Observatory

Scot Pellet's Observatory built in 2009 on Norris Lane in Alabaster, AL

Date: 08/11/2009
Owner: Scott Pellet
Size: 85 items
nextlast
100_2959.JPG

100_2959.JPG

The beginning: 2009 February. At this point I was struggling with the decision of whether I should build an observatory or an ARK. It rained practically continuously for the first three months of construction.

Date: 01/14/2004
Views: 9607
100_2960.JPG

100_2960.JPG

I have cleared about 1.5 acres over a period of about 3 months. This effort took about 200 chain saw sharpenings and a lot of timber burns. Some of the piles are still visible here.

Date: 01/14/2004
Views: 2253
100_2964.JPG

100_2964.JPG

The hole for the pier is five feet deep (to bedrock) and was quite a challenge to keep dry during the concrete forming and pouring.

Date: 01/14/2004
Views: 2620
100_3018.JPG

100_3018.JPG

As if the weather wasn't already weird enough, even for Alabama. Then this happens

Date: 01/15/2004
Views: 2523
100_3033.JPG

100_3033.JPG

Pouring the slab under the garage end of the building. the white pipes sticking up are for water and power hookups. Thankfully, we had a rare sunny day.

Date: 03/04/2009
Views: 2770
100_3034.JPG

100_3034.JPG

It was tricky keeping the truck from getting stuck in the muck of the driveway.

Date: 03/04/2009
Views: 2903
100_3035.JPG

100_3035.JPG

This shows the forms for the concrete pier. The base of the pier is a 5'x5'x5' block with the remainder in the shape of a ziggurat. It is well reinforced with steel. The concrete in the upper portion was mixed by hand and placed with lifting buckets up

Date: 03/04/2009
Views: 2802
P3070002.JPG

P3070002.JPG

The completed slab and pier. At this point I was beginning to wonder whether I had created a monster that I could not finish: physically or financially.

Date: 03/07/2009
Views: 2220
P3070004.JPG

P3070004.JPG

This is a view of the top of the pier with the J-bolts to be used for mounting the Lesueur metal pipe pier/mount. the top of the concrete is 9' above the slab to be level with the finished second floor.

Date: 03/07/2009
Views: 1849